Uploaded image for project: 'Xray for Jira'
  1. Xray for Jira
  2. XRAY-11382

Cluster locks on Xray Issue Link actions are too generic and might cause the application to be slow or unresponsive

    XporterXMLWordPrintable

Details

    • Bug
    • Status: QA Testing
    • Minor
    • Resolution: Unresolved
    • Xray DC 8.2.2
    • Continuous Delivery
    • Core
    • None
    • DC

    • NOTRUN

    Description

      Steps to reproduce:

      • Create two Dynamic Test Plans based on two filters
      • Change the filters in a way that the Test Plans will have to delete a lot of tests and add other tests
      • Open the first Test Plan. The query to delete the links gets stuck
        • The Test Plan does not show
      • Open the second Test Plan; the links will not be updated, causing the Test Plan not to be loaded for the user.

      Attachments

        Activity

          People

            Unassigned Unassigned
            dpca Diamantino Campos
            Patricia Mateo
            Votes:
            1 Vote for this issue
            Watchers:
            1 Start watching this issue

            Dates

              Created:
              Updated:

              Time Tracking

                Estimated:
                Original Estimate - Not Specified
                Not Specified
                Remaining:
                Remaining Estimate - 0 minutes
                0m
                Logged:
                Time Spent - 4 weeks, 4 hours
                4w 4h