Description
A new JIRA gadget "Test Plan Overall Status" should provide a the status of the Tests in the context of the Test Plan.
Aim: see the progress of the Test Plan, including for all the Tests being tracked within it.
Filters:
- Test Plan key
Analysis:
- test environment ("All" option, by default)
Show as table: flag (disabled by default) for showing the chart values in a table
Gadget Title: by default "Test Plan Overall Status" but may be customized.
Table layout:
Test key | Test summary | Status |
CALC-1 | Test positive addtion of 2 numbers | PASS |
Graphical layout:
Note: the numbers in the overall execution status should be links to the respective Tests.