the analysis by Test Plan in the traceability report shows all tests and all runs

    XporterXMLWordPrintable

Details

    • Bug
    • Status: Closed
    • Major
    • Resolution: Done
    • None
    • R3.1.0
    • None
    • R3.1.0 S2
    • OK

    Description

      Whenever using the the analysis by Test Plan in the traceability report, all Tests are being shown and all runs for those tests are being also shown.
      When doing analysis by a given Test Plan,

      • only the Tests that are part of the Test Plan should be shown in the "Tests" column
      • for the previous Tests, only runs from Test Executions related with that Test Plan should be shown (seems to be already ok)
      • the Test status shown in the "Tests" column should be the consolidated status (i.e. latest status) as it is within the Test Plan

      Attachments

        Issue Links

          Activity

            People

              dada dada
              smsf Sergio Freire
              Votes:
              2 Vote for this issue
              Watchers:
              5 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Time Tracking

                  Estimated:
                  Original Estimate - 2 days Original Estimate - 2 days
                  2d
                  Remaining:
                  Remaining Estimate - 0 minutes
                  0m
                  Logged:
                  Time Spent - 2 days, 6 hours, 45 minutes