Uploaded image for project: 'Xray for Jira'
  1. Xray for Jira
  2. XRAY-2728

As admin, I can restrict execution of tests only to the test run assignee

    XporterXMLWordPrintable

Details

    • Story
    • Status: Closed
    • Major
    • Resolution: Done
    • None
    • R3.4.0
    • Execution Page
    • None
    • R3.4.0 S5, R3.4.0 S3, R3.4.0 S4, R3.4.0 S6
    • OK

    Description

      It should be possible to restrict the execution of the tests only for the Test Run assignee. This should be a global Xray configuration and should be enabled by default for new installations. Current Xray installations must remain with this setting disabled.

      ACs:

      • Project admin can execute tests either the setting is enabled or disabled.
      • When this setting is enabled, only assignee users can execute Test Runs.
      • Other users should be able to access the execution screen in readonly mode.
      • Only the Test Run assignee can start executing a Test Run.
      • If a TestRun has not started yet, other users must not be able to go to the Test Run screen, not even in readonly mode.
      • If TestRun is unassigned, the TestRun is not executable by a "current" user
      • A new global miscellaneous setting is provided on the Xray configuration enabled by default for new installations.
      • Current installations of Xray should display this feature as disabled.
      • Other users must be warned that they are not assigned to a given Test Run.
      • When other users enter the execution page in readonly mode, the readonly message should display the cause for why the TR is readonly.
      • Backend must also verify the restriction, thus, if a browser window has a non updated view and the user try to execute a test run without having permission an appropriate message error must be presented.
      • REST API call do not restrict to assignee.

       

      Attachments

        Activity

          People

            ipvm Isabel Moreira [X] (Inactive)
            dmdu David Duarte
            Votes:
            2 Vote for this issue
            Watchers:
            3 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved:

              Time Tracking

                Estimated:
                Original Estimate - Not Specified
                Not Specified
                Remaining:
                Remaining Estimate - 0 minutes
                0m
                Logged:
                Time Spent - 1 week, 2 days, 50 minutes
                1w 2d 50m