Uploaded image for project: 'Xray for Jira Cloud'
  1. Xray for Jira Cloud
  2. XRAYCLOUD-7604

It should be possible to have an option similar for iterations, like we have for Tests, where the Final Status from iterations should have precedence over the non-final

    XporterXMLWordPrintable

Details

    • UNCOVERED

    Description

      It should be possible to have an option similar for iterations, like we have for Tests, where the Final Status from iterations should have precedence over the non-final.

      Currently, when forcing an iteration with a Non-Final Status, this Status directly contributes to the Overall Test Run Status. This means that if the non-final has a higher rank than the Final one, the non-final is the one that will prevail.

      Consider the example below:
      We have two iterations, and the first one should be discarded N/A (seen as PASSED) for the overall Status of the Test, while the second one is PASSED. The final status of the Test is N/A, and it should be possible to be PASSED, in case we choose to ignore the Non-Final ones:

      Attachments

        Issue Links

          Activity

            People

              helder.ferreira Helder Ferreira
              amgt Ana Teixeira
              Votes:
              3 Vote for this issue
              Watchers:
              3 Start watching this issue

              Dates

                Created:
                Updated: