Uploaded image for project: 'Xray for Jenkins'
  1. Xray for Jenkins
  2. XRAYJENKINS-53

The execution results are not being imported to the same Test Execution, if using the Test Parameterized option and the parameter is not filled

    XporterXMLWordPrintable

Details

    • Bug
    • Status: Closed
    • Major
    • Resolution: Done
    • Jenkins R1.3.0
    • Jenkins R2.1.1
    • None
    • OK

    Description

      When using the feature "This project is parameterized" and use this parameter to specify on which Test Execution the Execution Results should be imported, if the parameter to specify the Test Execution is not filled before build the job on Jenkins, it will create different Test Executions for each execution results file.

      Steps to Reproduce

      Step Result
      Create a project and configure it as a Parameterized project
      Use the parameter on the Test Execution and check the option "Import to same Test Execution"
      Have more than one execution results file to be imported
      Build the job without filling the parameter
      The results were imported, however it were created three different Test executions (one for each execution results file)

      Attachments

        1. image-2019-03-18-15-17-32-356.png
          47 kB
          Miguel Fernandes
        2. image-2019-03-18-15-20-56-770.png
          34 kB
          Miguel Fernandes
        3. image-2019-03-18-15-21-42-561.png
          93 kB
          Miguel Fernandes
        4. image-2019-03-18-15-22-57-508.png
          45 kB
          Miguel Fernandes
        5. image-2019-03-18-15-26-19-402.png
          94 kB
          Miguel Fernandes

        Activity

          People

            pmmr Pedro Rodrigues
            maaf Miguel Fernandes
            Votes:
            3 Vote for this issue
            Watchers:
            2 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved:

              Time Tracking

                Estimated:
                Original Estimate - Not Specified
                Not Specified
                Remaining:
                Remaining Estimate - 0 minutes
                0m
                Logged:
                Time Spent - 1 day, 1 hour, 20 minutes
                1d 1h 20m