Details
-
Bug
-
Status: Closed
-
Critical
-
Resolution: Done
-
None
-
None
-
XRAY 2020 Sprint 11, XRAY 2021 Sprint 1
-
Description
Steps to reproduce:
- Create a story (S1)
- Create two tests (T1 and T2)
- Add both tests to story
- create a test plan (TP1)
- Add T1 to the test plan
- Execute it in the context of the test plan setting the execution status to PASS
- Check the Requirement Status of the S1:
Expected Result:
Requriement Status should be OK for the scope of TP1
Actual Result:
Requirement Status is NOTRUN for the scope of TP1